We check the product before your customers do. We answer to the client, not to the contractor — which is why we find what a development team has no interest in showing.
An independent check earns its cost where a production bug costs more than the testing. One sign is enough:
You're accepting a contractor's work and don't know what to check
You have no QA engineers, or they're busy on other projects
The product was built in-house and needs an outside opinion
Bugs regularly reach users and cost real money
There's no confidence before a release that nothing will surface
You need specific checks: load, security, integrations

«Acceptance testing is an independent view: we answer to the client, not to the contractor.»
The mix of testing types is chosen for your product and its risks. Each card covers what we check and what you learn from it.
We verify the product against the specification and stated requirements, scenario by scenario.
What you get
Documented proof of what was promised and what actually works — something to take to the contractor.
We check that data exchange with external systems and between modules is correct and stable. Tools: Postman, Charles.
What you get
Confidence that data isn't lost at the seams between systems — where things break most often.
We assess not just how the interface looks but whether it is logical and usable for the end user.
What you get
A list of the places where users stumble — before it shows up in reviews.
We look for vulnerabilities and gaps in how confidential data is protected. Tools: OWASP ZAP, Burp Suite, Nessus.
What you get
Vulnerabilities are closed before anyone outside finds them.
We simulate a peak influx of users to see whether the infrastructure holds. Tools: K6, JMeter, Yandex Tank.
What you get
A clear ceiling on load and knowledge of what fails first once it's passed.
We compare what real users expect against what the development team is delivering: scenarios and interviews.
What you get
Feedback from the people who will actually use it, not from the team that built it.
We come in once for acceptance, reinforce your team, or rebuild the quality process end to end.
A one-off independent check before you sign off a contractor's work.
Terms
When testing is needed continuously and you have no engineers of your own.
Terms
When the team does test, but bugs still reach production.
Terms
Six stages from reviewing requirements to retesting. You see interim results, not only the final report.
Specification, scenarios and risk areas
Types of testing, scope and tools
Checklists, test data and environment
Running the checks and logging defects
Defects by severity and their consequences
Verifying fixes at a 50% discount
The report is written so you can take it to a contractor and make decisions with it, not file it away.
See a sample report — it shows exactly what you receive.
Protector
Built an app to protect children in dangerous situations with live location sharing and fast help escalation
View case
PreventAge
Rebuilt an educational web platform with admin panel, payments and improved performance
View case
Farmakopeyka
A pharmacy-chain mobile app: search and order medicines, consultations, and a map of nearby stores
View caseCHTPZ Education Center
A mobile app for students, teachers, and parents in the Future of White Metallurgy program
View case
Athletes Academy
A mobile app and admin panel: athletes earn a sports rank on video and get the award by post
View caseBecause the contractor is checking their own work and is accountable for the deadline. We are accountable to you, so our interest is in finding problems rather than showing that everything is fine. That doesn't imply bad faith — internal testing and external acceptance simply have different goals.
A repeat check runs against checklists and test data that already exist: the preparation was done the first time and there's nothing to pay for twice. We verify that the reported defects are fixed and that the fixes didn't break anything nearby.
It depends on where a mistake costs you most. A product handling payments and personal data puts security and integrations first; a service with traffic peaks needs load testing. We agree the mix at the planning stage and explain the reasoning.
Yes, at any stage. The earlier the cheaper the fixes, but acceptance testing of an almost-finished product is still worth it: at least you'll know what you're signing off.
Cost depends on the amount of functionality, the mix of testing types and whether documentation exists: testing a product with no specification costs more, because the requirements have to be reconstructed. We estimate after reviewing the requirements, with a fixed scope and timeline.
The report is built to be handed straight to the contractor as a fix list: every defect with steps to reproduce, a severity and its consequence. Once the fixes land, we run the retest.
Tell us what the product is and what stage it's at. We'll propose a set of checks and the scope of work.